Skip to main content
Chicago Housing Authority header
File #: 26-11   
Type: Resolution Status: Agenda Ready
File created: 11/26/2025 In control: Real Estate Operations Development Committee
On agenda: 1/27/2026 Final action:
Enactment date: Enactment #:
Effective date:    
Title: Authorization to award a contract for architectural services at Robert Brooks Homes Retrofit project for Phases III-VIII.
Attachments: 1. Approved Architectural Services at Brooks Homes Contract Brd. Ltr. & Resolution No. 7
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

title

Authorization to award a contract for architectural services at Robert Brooks Homes Retrofit project for Phases III-VIII.

presenter

Presenter: Leonard Langston, Jr., Interim Chief Property Officer                     

Recommendation

The Operating Chairman recommends that the Board of Commissioners of the Chicago Housing Authority (CHA) authorize the award of the Architect of Record (AOR) services contract for the Robert Brooks Homes Retrofit (Phases III-VIII) project to the below listed qualified vendor for a five (5) year term for the not-to-exceed amount of $1,601,440. 

 

Recommended Awardee

Base Contract Value

Base Term

Option Terms

Total Contract Value

KOO LLC

$1,601,440

5 years

N/A

$1,601,440

Total:

$1,601,440

 

 

$1,601,440

 

The requested action complies in all material respects with all applicable federal, state, and local laws, and CHA policies. CHA staff has completed all necessary due diligence to support the submission of this initiative.

Funding

MTW Funds

 

Background

The Robert Brooks Homes development was built in 1943. The property consists of 44 row home buildings, with exterior masonry walls and concrete floors. The buildings typically have five to eleven residential units in each and are comprised of one-to-four-bedroom units.

 

Six (6) two-story row home buildings are being renovated as part of phase II. To continue enhancing the residents’ quality of life, 38 two-story buildings at Brooks Homes will be part of the next phases (III - VIII) and undergo comprehensive renovations including, but not limited to, new plumbing, electrical, and HVAC systems.  The CHA desires to prioritize energy conservation and material sustainability in project designs. CHA requires compliance with the City of Chicago’s energy code requirements, which will result in a more environmentally friendly and efficient residence. In addition, designs and systems must meet all regulatory requirements as required by Federal, State, and Local laws or ordinances.

Procurement Activities

Specifications prepared by CHA staff were publicly advertised as RFP Event 3302 for AOR Brooks Homes Retrofit Phases III-VIII September 11, 2025. A Pre-Proposal Conference was held on September 22, 2025, and sixteen (16) firms attended. Eleven (11) proposals were received on October 14, 2025. The respondents to the RFP are depicted in the table below:

Vendor Responses

EC Purdy & Associates

Globetrotters Engineering Corp

HED

JP Architects Ltd.

KOO LLC

Moreno Architects Ltd.

Senga Architects Inc.

Stantec Architecture Inc.

Studio AH LLC

Studio ARQ, LLC

UrbanWorks

 

The recommended vendor was selected through a competitive procurement process in accordance with HUD regulation CFR 200.318 that evaluated responses in the following areas:

 

1.                     Specialized & Past Performance - 30 Points

2.                     Approach & Workplan - 30 Points

3.                     Organizational Structure & Key Personnel - 10 Points

4.                     Proposed Fees - 20 Points

5.                     MBE/WBE compliance -- 10 points

 

Final scores received from the Evaluation Committee were used to determine the competitive range. Oral presentations were waived.  Best and final offers were completed. Based on the overall scoring, CHA staff recommend KOO LLC for award to provide AOR services for Phases III-VIII of the Brooks Homes Retrofit.

Contracting Requirements

CHA staff has reviewed the proposed vendor and has determined the vendor’s utilization plan meets the CHA's stated goals.

 

KOO LLC will satisfy the CHA 20% contract requirements as a self-performing WBE   at 59.32% direct participation. KOO LLC is certified as a WBE by the City of Chicago.  Additionally, KOO LLC has committed to additional direct MBE participation of 28.55% by subcontracting to Calor Design Group (MBE) that is certified by the City of Chicago. KOO LLC will satisfy their Section 3 contract requirement by subcontracting to HUS architecture a 75% Section # business at 3.43%.

 

KOO LLC has previously served as a prime contractor on five (5) contracts and a sub-contractor on three (3) of which one (1) is currently open. These contracts span from 2010 through current. KOO LLC has a history of meeting the CHA contract requirements through direct participation and direct subcontracting.

 

Vendor Background Information

Jackie Koo, Founder; 55 W. Wacker Drive, Suite 600C, Chicago, IL 60001. KOO LLC is a mid-size architecture, interior design and urban planning firm established in 2005. They craft buildings and interior environments that create a unique identity for each project. They create space and atmosphere. They embrace the new, temporal, and experimental while staying mindful of the technical rigors that experimentation requires. KOO LLC is a certified Minority Business Enterprise (MBE), Women’s Business Enterprise (WBE), Disadvantaged Business Enterprise (DBE) and a member of the US Green Building Council.

 

Based on the foregoing, it is in the best interest of the CHA for the Board to authorize the Operating Chairman or his designee, to enter into a contract with KOO LLC as the for Architect of Record for Phases III-VIII of the Brooks Homes Retrofit in the amount of $1,601,440.

 

 

Respectfully Submitted:

 

 

______________________

Matthew Brewer

Operating Chairman